国产极品裸体av在线激情网,av影院在线免费观看不卡,国产欧美精品aaaaaa片,国产日本精品视频一区二区,日本一区二区在线高清观看,国产日产久久高清ww,久久人妻av无码中文专区,中文字日产幕码三区的做法步,二区三区三区视频在线观看,日本在线一区二区三区不卡

Hello! Welcome to Shenzhen Jintong Display Technology Co., Ltd. (splicing screen)!
中文版 | English
News
Industry trends
Requirements and Environmental Design for LCD Splicing Wall
Number of views:1785order Release Date:2020-11-26
To ensure the smooth implementation of the LCD splicing wall construction project and the normal operation of the system equipment, the construction of the equipment must meet the following environmental conditions:

1、 Power supply

Considering that the system may encounter special situations where there may be a current surge due to the interruption of power supply, the splicing unit itself has a power protection design to ensure the normal and safe operation of the equipment.

1. The power supply voltage should be stable and reliable, especially to prevent immediate power up after power failure. Therefore, in principle, the power supply of the splicing system must be powered by a corresponding power UPS.

2. The splicing system, image controller, and control PC require in-phase power supply.

3. The system equipment should have good grounding, with a grounding resistance of less than 2 Ω, to ensure that the equipment is not damaged in the event of special conditions such as lightning strikes.

4. The power supply of the system is AC 220V ± 5%; Use a three eye socket with a protective grounding wire; The number of sockets is related to the number of splicing units

2、 Light requirements

1. If the windows in the control room are large, direct sunlight should be avoided and curtains should be used to block the light. The curtains should be dark in color.

2. It is recommended to use recessed tube lights for lighting. The lights should not be directly aimed at the screen direction and should be kept at a distance of 3 meters from the screen to avoid affecting the projection effect.

3、 Air conditioning requirements

1. There should be good temperature control and heat dissipation measures in the maintenance channel behind the splicing screen panel. If it is a central air conditioning system, there should be air conditioning inlet and outlet ports. If there is no central air conditioning system, specialized air conditioning should be added, and the power of the air conditioning system depends on the size of the large screen.

2. The temperature inside the maintenance channel and the temperature in the control room of the splicing curtain wall should be controllable and kept basically the same.

4、 Installation requirements

② The cabinet base is usually in direct contact with the anti-static floor to ensure that the ground can withstand gravity for a long time without deformation.

① The installation ground requires a flat and sturdy surface, strong load-bearing capacity, and is not easily deformed.

5、 Requirements for wiring and trunking

1. If it is a fixed floor such as floor tiles or composite wood flooring, it is required that there is a wiring groove between the signal source (computer RGB signal, video signal) and the control computer to the graphics controller (or projector interface), and the shorter the wiring distance, the better.

2. Weak current cables (RGB, video, network, serial port, mouse and keyboard extension cables, etc.) should be routed separately from strong current cables to avoid signal interference. If using cable trays, it is not possible to share one cable tray, and different cable trays should be used for separate wiring.

3. If it is an anti-static floor, holes should be opened at the wiring outlet to leave cable outlets.

6、 System environment

1. The temperature and humidity of the air conditioner before and after splicing the screen should be adjusted to the same scale to ensure the heat dissipation of the splicing wall and the flatness of the splicing screen

2. The fire sprinkler shall be as far away from the splicing wall as possible, and spray extinguishing agent shall be used.

3. The splicing curtain wall room requires cleanliness and dust prevention.

4. The back of the splicing system is a maintenance channel, and the width of the maintenance channel is generally not less than 0.60 meters

5. Large screen rooms require good temperature and humidity control. The working environment temperature is 0 ℃ -40 ℃, and the relative humidity is 10% -90%. There should be air conditioning behind the spliced curtain wall.

7、 Requirements for decoration and equipment location of operation console (room)

1. The placement of the image controller should be located in the aisle (inside the cabinet) next to or behind the curtain wall, and should be as close as possible to the projection box

2. The control computer should be located as close as possible to the opposite direction of the splicing screen and at a suitable distance from it for debugging, color adjustment, and other operations.

3. The position of the operation control computer should be directly opposite the splicing screen, and it is required that the operator can easily and intuitively see the operation of the splicing screen. If there is a dedicated partitioned operation control room, there should be transparent glass between the operation control room and the large screen display room for easy viewing by the operator.


Contact Us
Address: Building B, Lihao Yongda Technology Park, No.1 Dongfang Avenue, Guangming District, Shenzhen
Phone: 0755-23576861
24-hour service hotline: 139 2371 0018

QR code
CopyRight ? 2017 Shenzhen Jintong Display Technology Co., Ltd. All Right Reserved
展開
  • Tel

  • 075523576861
QR code
亚洲国产av中文字幕| 国语对白做受xxxxx在线| 羞羞视频在线观看| 高潮内射双龙视频| 国产麻豆精品久久一二三| 国产精品九九九久久九九| 亚洲免费观看一区二区三区| 久久精品伊人久久精品伊人| 久久精品av在线观看| 亚洲av日韩综合一区二区三区| 日日碰狠狠添天天爽超碰97| 日韩熟妇精品视频一区二区| av手机在线天堂网| 国产丝袜高跟美腿一区在线| 一区二区午夜视频在线观看| 亚洲av综合色区无码另类小说| 国产精品多p对白交换绿帽| 久久免费看少妇高潮v片特黄| 久久精品国产亚洲AV高清y w| 日韩精品视频av在线观看| 人妻少妇中文字幕在线观看| 久久天天躁狠狠躁夜夜2020一| 最新亚洲人成无码网站| 婷婷成人亚洲综合国产| 一区二区三区av在线| 亚洲sm另类一区二区三区| a亚洲va欧美va国产综合| 免费毛片性天堂| 日本精品人妻一区二区三区| 久久久麻豆精亚洲av麻花| 亚洲第一最快av网站| aaaaa级少妇高潮大片免费看| 亚洲国产另类久久久精品小说| 青青草最新在线视频观看| 久久精品国产亚洲av不卡国产| 久久久久无码国产精品一区| 婷婷五月综合缴情在线视频 | 国精产品一区一区三区有限在线 | 吃奶还摸下面动态图gif| 日韩人妻无码精品二专区| 五月婷婷开心五月播五月|